Irish Cement (Cork)

About the Irish Cement Project

Client requirements
Due to the high risk of explosion/fire Modubuild were asked to provide a lining system to provide fire and explosion protection to the inside of an 18mtr high curved silo where powder cement is loaded into tankers in Cork Harbour so as to prevent damage to adjoining buildings in the event of explosion.

Modubuild Solution

Install a support framework to inside of the silo onto which 9.5mm Durasteel panels were fixed at appropriate centers. The project was extremely complex due to the fact that wall was an 18mtrs high and curved. The installation  was completed without interfering with clients loading operations. Works were carried out in very limited space and Modubuild had to ensure that Articulated Trucks Could be loaded as soon as they arrived (On average 2 trucks per hour)

Scope Of Work

  • Supply and Install Scaffolding to facilitate access to area without affecting access routes for trucks.
  • Supply and install Galvanized Steel Support Framework.
  • Install Durasteel Panels to provide 4 hour Fire Protection and Blast resistance.
  • Install Durawall Panels to Low level areas at entrance and exit to provide fire protection to structural steel.
  • Supply and install Vermiculux Encasement to roof steel to provide 4 hour fire protection.