Ely Lilly 

Ely Lilly Project
About the Ely Lilly Project

Control Room Blast Wall

Client requirements

  • Design, Supply, Install and Provide Certification for a Blast resistant barrier to an existing control room located inside one of the Production Buildings. Blast resitance of 5KN/m² required.

  • The new barrier was to be light weight so that no additional foundations would be required as the control room is located on second floor of building.

  • The installation could not affect day to day operations in the area. No wet trades allowed in area.

  • Full certification of the installed system to be provided by single source.


Modubuild Solution

For this application Modubuild Visited site and carried out a detailed site survey. Following this a full schedule of works was submitted to our client. A detailed design was then carried out and drawings were issued to client for approval. Following approval of design the Blast wall framework and panels were manufactured off site. The Kit assembly was shipped to site on the agreed date and installation was completed within one week. The Blast wall was lined with a decorative cladding to match surroundings. The package included Blast resistant Doors and windows.

IE 02 Laboratory Building

Client Requirements

  • Design, Supply, Install and certify blast resistant barriers to 3 sides of production room located at the perimeter of the building.

  • One of the walls needed to be installed around existing pipe /service support structure so that room space would not be reduced. Wall thickness could not exceed 180mm.

  • Finish of blast wall needed to exactly match finish of the Cleanroom walls in surrounding areas.

  • Full certification of installation to be provided including doors, access hatch’s, service penetrations etc.

Modubuild Solution

For this application Modubuild designed a blast wall consisting of bespoke framework with Durasteel panels on blast side of wall. The Framework was supplied to site in Kit form so that installation could be very quick. The System also included 15mm Cleanroom Lining with recessed base to internal side, blast resistant doors and access hatch’s, blast protection to service penetration.