Modubuild have successfully delivered Europe’s Largest Durasteel MFL Barrier for Global Biopharmaceutical Company Amgen. The free standing cantilever MFL barrier was designed, prefabricated and constructed by Team Modubuild in record time. The high performance barrier has been designed to meet with all FM Global requirements for such barriers including 4 hour fire resistance (Structure, Integrity & Insulation), resistance to blast & Impact, seismic resistant and wind resistant. The Modubuild solution on this project resulted in several Months being saved on the construction schedule.